Geographic Issues Affecting BES Migration
Please Login to Remove!
I am in the process of upgrading my company's BES environment, and this involves transitioning into a dual BES setup, instead of a single BES environment. Our old BES is in Detroit, MI, and the second BES is located in Los Angeles, California. This is to be closer to our Domino Mail Servers located on the west coast.
I've found that migrations between the old BES in Detroit and the new BES in LA is progressing a lot slower that I would like. The process is taking about 20 minutes per each user; with almost 700 Users to migrate, this is unacceptably slow.
Is there a Domino setting that could be tweaked in order to speed this up? Are there any other tricks to speed up this type of migration?
Information about my BES Setup:
OLD Bes (located in Detroit, and will be retired once migration is complete):
BES 4.06 HF4
Domino 6.5.4 FP2
Windows 2000, SP4
Currently Hosting 850 Users
New BES #1 (Located in LA, California)
BES 4.1.4
Domino 7.0.2
Windows 2003, SP1
New BES #2 (Located in Detroit, and included for sake of completeness)
BES 4.1.4
Domino 7.0.2
Windows 2003, SP1
All of these BESes connect to the same Remote SQL 2005 Database located in Detroit.
|