i got a BES 3.6.3 (Exchange Server) running right now.
i´m now thinking about the upgrade to 4.0.
i received a package from RIM (BES 3.6. to 4.0 for
MS Exchange One Time Upgrade). Is it possible to do
a clean new setup with this package on a new machine
(after deactivating the old server). its a sbe BES.