Migrating users between Test and Prod BES server
Hello,
I currently have a BES 5.0.1 MR3 Exchange Production environment and a Test environment with SP2. I would like to move a few users to the test environment because I have SP2 running on that server. I will have them run in the test environment for a couple weeks if everything is good I will update my production environment. I will then move them back to the Production server. I intend to use the transporter tool to move them from server to server. I was wondering if you think this a good way to handle it or there is a better way? I did run into a possible issue that I'm not 100% sure was tied to the transporter tool. After I moved myself to the test environment and then back to the Production environment it seemed like I lost a couple calender entries. Could it have been the tool? After the move should I delete their entries from the database before I move them back? Thanks for any input. |
All times are GMT -5. The time now is 02:04 PM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.